Master_JCH_250.png

What Can We Do For You?

781.341.1500

or contact us by email

    IN color.png  emcornation.png

  • Home
  • About Us
    • Affiliations
    • Safety and Quality
    • Sustainability
  • Services
    • Fire Protection
    • Markets
    • The EMCOR Advantage
  • Case Studies
    • Bitotech / Heathcare
    • Commercial
    • Education
    • Entertainment / Hospitality
    • Manufacturing / Industrial
    • Mechanical Construction
    • Transportation
  • Contact
  • Careers

EMC Corporation - FRANKLIN, MA

Mechanical Services

Mechanical Services Franklin – EMC Corp. Project Einstein

CLIENT OBJECTIVES

To build a combination office and manufacturing facility within a short period of time, so the client could begin generating revenues from its products quickly.

VALUE DELIVERED

By having the heavy mechanical installation completed so the building could open on schedule, the client could begin immediate production, complete orders, and start generating revenue from its industry-leading computer storage systems.

PROJECT SOLUTIONS

J.C. Higgins HVAC services included installation of commercial heating and cooling systems such as 9,000 tons of centrifugal chillers, 160 air handling units, as well as more than 1,400 feet of 30-inch and 2,100 feet of 24-inch pipe with 85,000 inches of welding.

To complete this HVAC and mechanical systems installation project on an accelerated 10-month schedule, J.C. Higgins used fast-track mechanical construction methods that required two full-time shifts and over 100 pipefitters.

CLIENT BACKGROUND

EMC is a leading supplier of intelligent enterprise storage system and software solutions. This unique 680,000 square-foot facility contains both manufacturing and office space. It had some complicated requirements. Temperature changes in its Sybil rooms, for instance, fluctuate between 35°F and 115°F on a daily basis.

MANUFACTURING /
INDUSTRIAL
MANUFACTURING FACILITY

CLIENT:
EMC Corporation

GENERAL CONTRACTOR:
George B.H. Macomber Co., Inc.

ARCHITECT:
Gorman Richardson, Inc.

MECHANICAL ENGINEER: Shooshanian Engineering Associates

PROJECT DURATION:
10 months


cs_value.gif


case_box_check.gif New Construction
case_box_check.gif Retrofit
case_box_check.gif Electrical Construction
case_box.gif Mechanical Construction
case_box.gif Facilities Services
case_box.gif Consulting Services
case_box.gif HVAC Services
case_box.gif Energy Services

Case Studies

  • Bitotech / Heathcare
    • AMGEN Center
    • Brigham & Women's Hospital CWN
    • The Center for Life Science Boston
    • Lahey Clinic
    • Novartis Institute for BioMedical Research
    • Rhode Island Hospital
    • Women & Infants Hospital of Rhode Island
  • Commercial
    • Landmark Center
    • 10 St. James @ Arlington
  • Education
    • Boston University
    • Boston College
    • Harvard Medical School
    • Massachusetts Institute of Technology
    • Stonehill College
  • Entertainment / Hospitality
    • Millennium Place
  • Manufacturing / Industrial
    • EMC Corporation
  • Mechanical Construction
    • InterContinental Hotel Group
  • Transportation
    • Massachusetts Transit Authority
 

J.C. Higgins Corp.

  • About Us
  • Services
  • Case Studies
  • Contact

EMCOR Group, Inc.

  • About Us
  • Locations
  • Investor Relations
  • Sustainability Efforts
©2023 EMCOR Group Inc.

Privacy Notice  |  CCPA Notice at Collection  |  Sitemap

NYSE: EME